What should be the power supply and input turn-on order/descent?

In general, it is important to operate the power supply and input order within the ratings. Connect GND → Connect Vcc → Input of operation signal. Please refer to the data sheet for details.

Related Links

The following documents also contain related information.

FAQs

Application Notes

Products